News
TopProm meets Railways requirements
On April 13th the Shchedrukhinskaya plant underwent an inspection by the railway authorities in terms of designing and constructing non-public railway tracks.
The committee which included representatives from Russian Railways OJSC and TopProm JSC verified the three following requirements had been fulfilled:
- erecting a wagon inspection platform, equipped with industrial television;
- fitting the receiving-departure yard with a loudspeaker system;
- constructing a communication line between the loading facility and the Polosukhino station.
Compliance with these standards is necessary in order to get title to and to put into operation the facilities built and thus to increase the tonnage of cargo transported from 2.4 to 4.2 MTPA.